- Jan 25, 2024
- 111,083
- 353
- 1,000
On 4th April 24, a land slide occured near Lalpari, Gonar Farm, Chilas on main Karakorum Highway causing two way blockage of KKH for all types of traffic.
A team headed by Naib/Subedar Khalid and 02 soldiers were tasked to clear the slide and open the road.
During the clearance, a fresh slide triggered along with falling rocks from cliff and hit the FE Loader, resulting into injury of all three soldiers.
The soldiers were rushed to DHQ Chilas, for medical treatment and were further shifted to CMH Gilgit.
Naib/Subedar Khalid, has head injuries and his lever was badly damaged and Embraced Shahadat. Waseem, the operator of the Front End loader got his leg amputated due to severe injuries.
4:57 AM · Apr 6, 2024
A team headed by Naib/Subedar Khalid and 02 soldiers were tasked to clear the slide and open the road.
During the clearance, a fresh slide triggered along with falling rocks from cliff and hit the FE Loader, resulting into injury of all three soldiers.
The soldiers were rushed to DHQ Chilas, for medical treatment and were further shifted to CMH Gilgit.
Naib/Subedar Khalid, has head injuries and his lever was badly damaged and Embraced Shahadat. Waseem, the operator of the Front End loader got his leg amputated due to severe injuries.
4:57 AM · Apr 6, 2024